All operations on the routings are 1st piece inspected and stamped with an inspection stamp. No job is allowed to proceed until the 1st piece has been approved. All production jobs are inspected on a
percentage basis. This is determined by the total quantity of the order.
Inspection is carried out on every job leaving or returning back into the building. If a job is sent out to a vendor it will
be inspected before it is sent and also after it returns. At the Final Inspection period before a part is shipped to a Customer, the part is 100% inspected and a "Certificate Of Compliance" is
filled out stating that every aspect of the Customers print has been followed. |